ESD Broadloom Carpet Installation Guide Overview Click here to download the instructions as a pdf document
Please click here for the
UltraTough main page
Note: The following instructions should be reviewed prior to
installation. Every effort has been made to provide accurate
and reliable information in this guideline. This is only
intended as a guide for our customer’s use with our
recommended tools and materials. United SCP cannot accept
any responsibility for loss or damage that may result from
the use of this information, due to the possibility of
variations of processing or working conditions and/or
workmanship beyond our control. End user customers are
advised to conduct their own tests for a particular
application. We strongly recommend using a licensed and
experienced flooring installer to ensure satisfactory
results. These installation procedures are intended
to assist in the installation of United SCP UltraTough
Broadloom ESD Carpeting under most job conditions. Specific
questions regarding installation and maintenance not covered
within must be referred to the United SCP Technical Services
Department at 719-676-3928. Any variance from these
procedures will become the responsibility of the installer
and not the manufacturer. PRE-INSTALLATION PREPARATION: Check the quantity, color and lot numbers of
the tiles before beginning the job. DO NOT MIX M.O. numbers
(dye lots). Install by M.O. number sequence as indicated on
the box. All claims for damages or deficiencies must be made
prior to installation. GENERAL GUIDELINES: 1. The following installation guidelines as
stated herein should be reviewed prior to installation.
United SCP will not be held liable for product failure due
to improper installation. 2. All other contractors should be finished
with their work prior to installation. If work will be
occurring simultaneously, take the necessary precautions to
ensure a trouble-free installation. NOTE: The flooring contractor,
general contractor or building owner must have the concrete
slab tested for surface pH, moisture
transmission rate, and subfloor conditions. The results must
meet our test guidelines as stated below. United SCP will
not be held liable for installation failures if these
guidelines are not strictly adhered to. 3. Moisture: The site must
be tested for moisture randomly throughout the floor.
Moisture testing should be performed by ASTM F 1869 Calcium
Chloride Tests with moisture levels not to exceed 3.0 lbs.
/1,000 sq. ft. in 24 hours, or ASTM F 2170 In Situ Relative
Humidity Test readings when measured by this method, not to
exceed seventy-five (75) percent. If excessive moisture is
present, the general contractor or building owner must be
advised and a decision made if the installation is to begin.
United SCP will not be responsible for any moisture related
installation failures if these guidelines are not strictly
followed. This maximum threshold must hold true throughout
the life of the product. Otherwise, corrective action is
required. SITE TESTING AND CONDITIONING: 1. Temperature — The floor temperature,
carpet and adhesive must be maintained at a minimum of 65°F
for 48 hours before the installation and remain at this
temperature and/or not rise above 80°F at any time during
installation and 24 hours after the installation. 2. Surface pH — the concrete must be tested
for surface pH at several random points throughout the
floor. The pH range necessary is 5 - 9. Otherwise,
corrective action is required. GENERAL FLOOR PREPARATION: 1. Clean Floor — the floor must be clean and
free of all foreign matter including grease, oil, paint,
wax, dirt, dust, old adhesives or any material that might
interfere with the overall bond strength of the adhesive.
The floor should be sound and level. All holes, cracks,
depressions or protrusions must be filled with a compatible
Portland based patching compound, and then sealed with a
latex liquid and allowed to dry. 2. Caution: Cutback asphaltic adhesive must
be completely and thoroughly removed. No traces can come in
contact with the newly applied adhesive. Failure to do so
will result in an installation failure. SPECIFIC FLOOR PREPARATION: Concrete: New concrete must be clean, dry
and cured for a minimum of 90 days and free of parting
agents. All concrete should be checked for moisture. Dry,
dusty, porous floors may need to be sealed. Note: Sealers
will not correct a moisture problem. Ceramic Tile and Terrazzo Floors:
Use only URAS peel and stick adhesive. Ceramic
tile floors cannot be loose. Any loose tiles must be
removed. Grout lines must be filled and leveled. Strict
attention must be paid to the open time for adhesive to
become permanently tacky. VCT, Vinyl Tile and VAT:
Use only URAS peel and stick adhesive. Damaged tiles
should be filled or replaced, and loose tiles re-glued.
Patching compounds should be used to level any floor
irregularities and waxes should be fully eliminated to
ensure a proper bond. VCT should never be sanded or scraped
without proper safety and handling precautions. Special care
and are required for asbestos tile abatement. Other Resilient Flooring:
Use only URAS peel and stick adhesive. Homogeneous sheet
vinyl and solid vinyl tile may need be removed before
installation (contact United SCP for specifics). Old Carpet: Remove old carpet and adhesive.
Steel Flooring:
Use only URAS Adhesive for this type of install.Steel trenches must be
clean, level, dry and free from dust, paint or other
extraneous materials. Wood: Plywood, hardwood and particle board
used as subflooring must be a flooring grade and installed
to manufacturer’s recommendations. Joints should be filled
and any rough areas sanded smooth. Glossy surfaces need to
be roughened prior to spreading the adhesive. SITE CONDITIONS — ENVIRONMENT: Radiant heat: Heat must be lowered before
the installation to prevent floor adhesive from “setting”
too fast. Sealers: The use of sealers on floor
surfaces is generally not necessary except for sanded,
dusty, porous, and acoustical surfaces. Sealing cannot
overcome moisture conditions and must not be used for that
purpose. When used, sealers must be thin and fast drying.
They should be compatible with adhesives, which should be
applied only after sealer is dry. ELECTRICAL GROUNDING:
Please
Click Here Acclimate:
The floor temperature, carpet and
adhesive must be maintained at a minimum of 65°F for 48
hours before the installation and remain at this temperature
and / or not rise above 80°F at any time during installation
and 24 hours after the installation. NOTE: Unroll
Carpeting and relax Face Down for 6 to 24 hours prior to
installation. LAYOUT: Loose lay the carpeting
to insure fit in a manor that will reduce seams. The long
edges of this carpeting may require straight edging and
cutting of dross. This carpeting is very thick and tough and
does not lend itself to overlapping and cutting. Leave the
lengths at least 4 inches long. If Possible: All seams should run the length
of the area. Position flooring to keep incident light so as
not to strike across the seams. Reduce seams in areas
subject to pivoting traffic and avoid seams running
perpendicular to doorway openings. PILE DIRECTION: Where two
or more pieces of the same carpet are adjacent the pile
direction shall be the same as in other areas unless
otherwise specified. Ideally pile direction shall be toward
the entrance but other factors such as aesthetics and
economic use of the material may also be a consideration. Roll back carpeting to 1/2 of the length. NOTE: Use only United SCP Conductive
Adhesives. Call United SCP for help with adhesive selection.
NOTE: Always use sufficient ventilation when applying any
flooring adhesive. Apply Adhesive: United SCP recommends using
a
3/32” x
3/32”
x 1/8" U notch trowel providing a
typical coverage of about 100 sf/pg. Floor should have full
coverage of adhesive for proper bonding. For concrete and
other porous substrates lay the carpeting into the wet
adhesive. For non porous substrates allow the adhesive to
slightly tack up prior to laying the material. NOTE:
Do not exceed 15 minutes of adhesive open time.
Roll with
Repeat process for other 1/2. SEAM SEALERS: Follow standard seaming protocol. Seal all seams using a seam cement such as WF Taylor #775 or equivalent. Excess seam sealer should be cleaned from face fibers using an absorbent cloth immediately upon contact. POST INSTALLATION CARE: 1. Re Roll the entire installation with a 100 lb. roller once installation is completed. 2. Thoroughly vacuum carpeting. 3. A non-staining building material paper must be placed over the carpet to protect it when additional construction activity is to take place that would soil or stain it. Do not use plastic sheeting as it will trap moisture. UltraTough - Powerful Performance, Outstanding Value!